Generally speaking, when we do this project, we have to calculate its cost and see how to do it, which is more economical, so how to do it is very important, our steel structure warehouse is one of them, so how to save Beijing warehouse leasingWhat about money? 1. Foundation: Choose a reasonable foundation type, and control the section standard and burial depth of the foundation.This has a great impact on controlling the cost of the entire steel structure.2. Column: The column grid layout is the basis for determining the column span and the interval between two adjacent columns of each column.Generally speaking, in the color steel plate purification workshop, the column grid standard is between 6-12m, the column spacing is small, the transmission path is short, and the upper structure saves materials, but the basic cost may be high, and the column grid layout is reasonable, which has a greater impact on the price of the engineering structure..In addition, the choice of column cross-section shape and size also has a direct impact on engineering costs.3. Beam: Rectangular section beam is a common bending member, which is often used in planning, but the material utilization rate is very low.One is that the material stress is lower near the neutral axis; the second is that the bending moment of the beam varies along the length of the beam.Due to the low stress of most section beams, the material cannot be used very well, as long as the material utilization rate of the steel structure warehouse can be improved.Therefore, planning can choose plane trusses instead of rectangular beams. Plane trusses are equivalent to emptying beams and removing excess materials in beams, which is economical and reduces weight.It can also be developed into a space grid, and the utilization rate of materials can be greatly improved.